Goodyear’s board replaced its CEO on November 8, five days after a $90 million savings report. That report came from CEO Mark Stewart’s own turnaround plan. And the same report showed the tire business still making less than the year before, even after they’d sold off the pieces that didn’t fit.
The plan did its job
Goodyear’s the tire company with the blimp. Stewart took over in early 2024, and his plan, Goodyear Forward, came down to three things. Cut costs, sell off what didn’t fit, and get the company earning again.
And the plan did its job. Goodyear calls the money the plan saves benefits, and that’s where the $90 million came from. In 2026 the plan reported $107 million in the first quarter, then 95, then that $90 million in the third.
But look at what the tire side actually earned. That’s operating income, basically what they make building and selling tires before the head office stuff, interest and taxes. And every one of those quarters, it came in lower than the year before. Three quarters in a row, and that’s after a strong end to 2025.
Why the tire business still fell
They sold fewer tires and their costs kept going up, and the plan just couldn’t make up for both of those. On November 4, in the results, Stewart said it himself. Small, incremental improvements alone won’t get them where they need to be.
Four days later the board made one of its own directors interim CEO, and the chair just said it was the right moment to transition leadership. That’s the only reason they gave, so I’m not going to guess past it.
The plan’s number vs the business number
But I can tell you what I see, because I’m the COO, the chief operating officer, of a $50 million plus company, and it’s pretty simple. The plan’s number told them the plan was working, and it was. What it couldn’t tell them is whether they were working on what was actually pulling the business down.
Only the business number, the one that says what you actually earned, tells you that. For Goodyear, that’s what the tire side earned.

The same thing at $2 million a year
Picture the same thing in a business your size, an online pet supply brand doing $2 million a year with six people. The owner moves to a cheaper warehouse to pack and ship the orders, and saves about thirty-five hundred dollars a month. And that’s real money. Her monthly report says it’s a win, three months in a row.
But over those same three months, what it costs to get a new customer through ads goes up 20%. So what the brand keeps on each order, meaning what’s left after the product, the shipping and the ads, goes down anyway. The savings are fine. It’s just that nobody’s working on the line that’s actually falling.
That’s where people get stuck. A new project reports its own number, and it’s usually a good one, because the person who started it picked it. You can work every hour you have, and the business can still shrink. You have to be working on the right things.
So I put together the one-page template I use for this. It’s a trend chart for each of your main numbers, and a card for every project with the one number on those charts it has to move.
Goodyear’s plan hit its own number, and the business went the other way. And the business number is the one the company actually lives on.
How to catch it in weeks, not quarters
Goodyear’s turnaround plan piled up almost $300 million in savings in the first nine months of 2026, while its tire business earned less every quarter. Here’s how you’d catch that in a few weeks instead of a quarter.
1. Trend charts first
Look at how the business is doing before you look at any project. Pick your main numbers, five at most, like weekly revenue, what you keep on each order, and cash in the bank. If you’re measuring everything, you’re measuring nothing. Put each one on a trend chart, just a line, week by week, going up, going down or flat. A number tells you where you are, and a trend tells you where you’re going.
We used to run a Monday KPI review, our weekly look at the key numbers, and it took two hours. It was just spreadsheet after spreadsheet, and half of it was working out whether a number was better or worse than the week before. We made trend charts mandatory and capped each group at five numbers, and now we’re done in about 45 minutes. And we spend that time on what to do about the numbers, not on figuring out what they say.
2. A card for every project
Every project gets a card before it starts. On it, the one line on those trend charts it’s supposed to move, by how much, and a check date.
Say an online store moves to a cheaper warehouse. The line on its card isn’t the savings. It’s what the store keeps on each order. The check date depends on the kind of project. A promo or an ad test, a few weeks. A new hire or a big cost program, more like a quarter.
3. The 30-minute weekly meeting
In the weekly meeting, read the lines first, then the cards. Then bottlenecks, whatever’s slowing anybody on the team down, and leave a couple minutes at the end for anything you missed. 30 minutes is plenty.
And for each card, don’t ask what did you do this week. Ask did its line move, and what else, besides this project, is pushing that same line up or down right now.
That last question is really the one that saves you. For that store, the warehouse card looks like a win, because the savings came in, but the line it sits under is falling. And when you look at what else is moving that line, it’s ad costs. Every new customer costs more to bring in, so there’s less left on every order. So the owner doesn’t kill the warehouse move. She starts a new card for what a customer costs to bring in, with its own check date.

4. Change it or stop it
When the check date comes and the line hasn’t moved, you either change the project or you stop it. The math is the math.
The template has the trend charts and the project card on one page, so you can set it up before Monday.
Make every project answer to its line
Goodyear’s plan reported its savings every quarter while the tire business earned less. So make every project in your business answer to the line it’s supposed to move.
Think about your last new project. Could you name the one number it was supposed to move, yes or no?
Questions people ask
Why did Goodyear’s tire business earn less while its plan reported savings?
They sold fewer tires and their costs kept going up, and the plan just couldn’t make up for both of those.
Why does a project’s own number usually look good?
A new project reports its own number, and it’s usually a good one, because the person who started it picked it. You can work every hour you have, and the business can still shrink.
How many numbers should I track on trend charts?
Pick your main numbers, five at most, like weekly revenue, what you keep on each order, and cash in the bank. If you’re measuring everything, you’re measuring nothing.
What goes on a project card?
The one line on those trend charts it’s supposed to move, by how much, and a check date. The check date depends on the kind of project: a promo or an ad test, a few weeks; a new hire or a big cost program, more like a quarter.
What should I ask about each project in the weekly meeting?
Don’t ask what did you do this week. Ask did its line move, and what else, besides this project, is pushing that same line up or down right now.
What if the line hasn’t moved by the check date?
You either change the project or you stop it. The math is the math.
Sources
Your next step
01
This template · free
The Blimp Template: Trend Charts, the Project Card and the 30-Minute Weekly Meeting
The one-page template I use so every project answers to the line it’s supposed to move: a trend chart for each of your main numbers and a card for every project, so you can set it up before Monday.
Your first moveBefore Monday, pick your five main numbers and put each one on a line, week by week, so you can see which way it’s going.
02
Kyle’s Library · free
Get free access to Kyle’s whole library
One email opens every template and checklist from Kyle’s videos, right here on the site. New ones come by email as he adds them.
- AI Switch Audit: Find Meta’s AI Ad Switches and Give Each One an Answer
- Peak Hour Plan: Five Steps to Staff Your Busiest Day by the Hour
- Reason Checklist: Two Lines and Three Questions Before You Take Work Back
- Change Log Template: One Line per Change, One Number to Watch
- Override Template: The Order Sheet, the Change Column and the Running List
- +10 more